• Welcome to SDCFans - The Unofficial Fan Site For Silver Dollar City. Please log in or sign up.

Project 2027 Tracker

Started by Swoosh, February 09, 2025, 02:45:30 PM

Previous topic - Next topic

hollijo

That is super exciting. I am really wondering when supports/track will get onsite.

legoerosion

Looks like the foundation for the station has been made between the lifthill of Wildfire and first hill of Powder Keg. Will share photos after we leave today.

legoerosion

Here is a look of things on the Wildfire side. That looks like a station foundation to me, but it could be anything at this point.

I do notice a building way in the back - directly to the right of the porta potty roof. I believe that is on property, must be a BOH building.

Obviously more footers being made on this side as well.

tmstephe

Is it typical for footers to have conduit running to them? Would this indicate a launch in this area?

ColaSDC

I was there yesterday and I can confirm that there are a TON of footers. Especially on wildfires lift you can see them. The general layout really makes me think hyper, or at least an airtime-focused ride. Mack and Vekoma are my top 2 manufacturers for this project.