91
Construction/Rumors / Re: SDC's 2023 Project(s) and Park Developments
« on: March 11, 2023, 09:57:33 PM »
Instead of driving past the paid lot, doing a 180, driving back by the lot to get to the booths, and then two left turns to park, you drive in and the booths are in the general area where the 180 turn was before. After paying/showing season parking, you just turn right into the paid lot. Much easier than the previous setup.
It may not be quite as far as where the 180 turn was before. So my map illustration may be a little off, but it’s the general idea. With all of the clearing and construction, the actual location wasn’t super obvious.
It may not be quite as far as where the 180 turn was before. So my map illustration may be a little off, but it’s the general idea. With all of the clearing and construction, the actual location wasn’t super obvious.