Author Topic: SDC's 2013 Project  (Read 722005 times)

Grapeslie

  • McCoy
  • Posts: 150
    • View Profile
Re: SDC's 2013 Project
« Reply #555 on: April 27, 2012, 07:14:57 AM »
Now one of the few things we apparently know is that this ride will use RMCC topper track. Now I have never experienced their topper track. Could anyone fill me in on how it rides.
The Scariest Part Of The Ride Is The Lift Hill!

Wildfire

  • Hatfield
  • Posts: 91
    • View Profile
Re: SDC's 2013 Project
« Reply #556 on: April 27, 2012, 07:17:48 AM »
I'm going to be there tomorrow. I will be sure to take a ride on the train ;)

sanddunerider

  • Master Craftsman
  • *
  • Posts: 8090
    • View Profile
Re: SDC's 2013 Project
« Reply #557 on: April 27, 2012, 07:36:50 AM »
I'm going to be there tomorrow. I will be sure to take a ride on the train ;)

Try to get pics of the Valley, it will be on your left side after you pass the Hobo Junction,  You may be able to see it, when they "change" engineers...

If you get pics , please post them. Shave has yet to see the valley with the footings in it.. thanks

OH YEA!!!  Have a great visit!.

Swoosh

  • Master Craftsman
  • *
  • Posts: 6386
  • Editor
    • View Profile
    • THE Midwest Info Guide (MiG)
Re: SDC's 2013 Project
« Reply #558 on: April 27, 2012, 12:51:33 PM »
With the trees all "leafed" out now, it is impossible to get a good shot of the valley.  Believe me, I tried.  You can see it, but you can photograph them from a moving vehicle.
SWOOSH

MissinTheGreenTrams

  • Craftsman
  • Posts: 1587
    • View Profile
Re: SDC's 2013 Project
« Reply #559 on: April 27, 2012, 01:03:06 PM »
Dern tree growth. Ruining the surprise for us nosey roseys. I cant WAIT to see the new ride!! Do yall think it will be done by christmas and ready to open next year? Or will they work on it through the cold cold winter months?
The smell of asphalt and butane says home!

BackInTime

  • Cave Guide
  • Posts: 395
    • View Profile
Re: SDC's 2013 Project
« Reply #560 on: April 27, 2012, 01:47:23 PM »
I for one hope it takes until next March to complete this one. That would surely mean a bigger ride.

shavethewhales

  • Administrator
  • Master Craftsman
  • *****
  • Posts: 4172
    • View Profile
    • SDCFans.com
Re: SDC's 2013 Project
« Reply #561 on: April 27, 2012, 02:47:46 PM »
Vertical construction will be complete by the end of summer I'm sure. Even big coasters only take a few months for major construction.

Word from chadster on TPR is that there is Topper Track being installed on the lift as we speak.

Swoosh

  • Master Craftsman
  • *
  • Posts: 6386
  • Editor
    • View Profile
    • THE Midwest Info Guide (MiG)
Re: SDC's 2013 Project
« Reply #562 on: April 27, 2012, 03:56:59 PM »
I-beam or topper?  I find it hard to believe if topper. It only replaces the top few layers of wood laminate and that takes time to lay。
SWOOSH

cjfootball_89

  • Hatfield
  • Posts: 82
  • Proud SDC fan for almost two decades!
    • View Profile
Re: SDC's 2013 Project
« Reply #563 on: April 27, 2012, 10:03:29 PM »
This is the view of the new coaster from McDonalds. In one picture Powderkeg is on the far right and the new coaster is on the far left. In the other picture there is a close up of the coaster. (Its a little blurry but its the best i could do from so far away)... More pictures to come once the weekend is over

http://www.flickr.com/photos/26634754@N07/6974147772/in/photostream/

Swoosh

  • Master Craftsman
  • *
  • Posts: 6386
  • Editor
    • View Profile
    • THE Midwest Info Guide (MiG)
Re: SDC's 2013 Project
« Reply #564 on: April 27, 2012, 10:10:39 PM »
You have the photo set to private.
SWOOSH

cjfootball_89

  • Hatfield
  • Posts: 82
  • Proud SDC fan for almost two decades!
    • View Profile
Re: SDC's 2013 Project
« Reply #565 on: April 27, 2012, 10:12:22 PM »
Sorry bout that! Fixed it!

shavethewhales

  • Administrator
  • Master Craftsman
  • *****
  • Posts: 4172
    • View Profile
    • SDCFans.com
Re: SDC's 2013 Project
« Reply #566 on: April 27, 2012, 10:31:54 PM »
Very neat, thanks for the photo. I never really noticed how big the skyline is getting from that angle, even though I always see it driving by.

The lift might not reach 100ft, but man, look how deep that valley gets. This thing is bound to be one of the most incredible rides in the country with this terrain.

cjfootball_89

  • Hatfield
  • Posts: 82
  • Proud SDC fan for almost two decades!
    • View Profile
Re: SDC's 2013 Project
« Reply #567 on: April 27, 2012, 10:34:16 PM »
The view of the valley is perfect from where McDonalds is!

I think the lift on the coaster still has a ways to go though. It doesn't look like it's reaching the peak yet.

Swoosh

  • Master Craftsman
  • *
  • Posts: 6386
  • Editor
    • View Profile
    • THE Midwest Info Guide (MiG)
Re: SDC's 2013 Project
« Reply #568 on: April 27, 2012, 11:14:19 PM »
Is this Branson West?
SWOOSH

cjfootball_89

  • Hatfield
  • Posts: 82
  • Proud SDC fan for almost two decades!
    • View Profile
Re: SDC's 2013 Project
« Reply #569 on: April 28, 2012, 12:29:27 AM »
Yep!